I'm aware that spiraplan/team can document product risks and there's an FMEA app for FMEA style risks.

We would typically use the FMEA as a tool to evaluate the device design (Design FMEA, Software FMEA, etc) and that would tell us how the device itself would fail (i.e. stop functioning, function at 50%, loss of certain features, etc). These 'hazardous situations' which arise due to various component failure modes, are then fed into a linked hazard analysis to evaluate the harm that each haz. situation can lead to. 

As far as I can see, spiraplan can only document risks as the product level (FMEA). Is there a way to set things up so that the risk output can be linked to a second risk evaluation (maybe in a different product that is purely a risk assessment), or perhaps the output can be fed into a project level risk evaluation?

Thanks

 

1 Replies
Wednesday, June 26, 2024
Avatar
re: DThompson Wednesday, June 26, 2024

Hello,

Thanks for your question. The FMEA app is set up for multiple products to perform independent assessment. But you can set up a cross-project association and connect the secondary risk in a different project with the main risks in the repository.

Please check the KB article that can help you with this.

Thanks

 

Spira Helps You Deliver Quality Software, Faster and With Lower Risk

And if you have any questions, please email or call us at +1 (202) 558-6885

 

Statistics
  • Started: Wednesday, June 26, 2024
  • Last Reply: Wednesday, August 14, 2024
  • Replies: 1
  • Views: 191